CTL-110 · human

Two-Person Rule in the Plant

Require a second person to approve and witness controller logic downloads and critical setpoint changes.

ProcessEffort MediumEffectiveness High

In OT, one person can change physical behavior. A two-person rule for PLC downloads and for changes to safety-related setpoints and alarm limits, with key switches kept in RUN, means changes need both a work order and a witness.

Make the rule practical for emergencies with a fast call-out approval that is reviewed the next day. Record who witnessed each change in the work order so it can be checked later.

Put it in place

  1. 01List critical setpoints and alarm limits and set approved ranges for each.
  2. 02Keep PLC key switches in RUN and require a supervisor to move them for planned work.
  3. 03Require a work order and a second engineer's sign-off for every logic download.
  4. 04Compare controller logic against the approved baseline after each change.

Counters 4 techniques