CTL-031 · human
Controlling Changes to Systems
A formal change process makes every modification approved, recorded and reviewable.
ProcessEffort MediumEffectiveness High
Unreviewed changes let an insider weaken controls, add backdoors or sabotage. Require tickets, risk-based approval, testing and rollback plans, and tie them to actual changes in infrastructure and configuration. Detect drift: changes with no ticket are suspicious. Use infrastructure as code and pull requests to make this automatic.
Put it in place
- 01Require a ticket reference for production changes.
- 02Use pull requests with independent review for infrastructure code.
- 03Detect configuration drift and alert on untracked changes.
- 04Review emergency changes after the fact.
Counters 9 techniques
- TAM-H-ACT-008Disrupting the Business
- TAM-H-ACT-019Letting an Outsider In
- TAM-H-ACT-021Making Unapproved Changes to IT Systems
- TAM-H-CVR-020Masking Network Activity
- TAM-H-RCH-004AI Assistants Wired Into the Business
- TAM-H-STG-016Gaining Higher Rights
- TAM-H-STG-020Hopping to New Systems
- TAM-H-STG-025Leaving Something Behind
- TAM-H-STG-054Switching Off the Guardrails